Potomac Edison owns and operates a Level 2 electric vehicle charging station in the town of Clear Spring, Maryland. The charging station is located in a public parking lot on N. Hawbaker Cir., one block north of National Pike/Cumberland Street. It’s about a 0.4 mile walk to the library and about 0.3 mile from McDonald’s. The two-port Level 2 charging station is part of Potomac Edison’s EV Driven program and uses the ChargePoint network.
Here are the details of this Featured PlugInSite.
Construction Cost
$22,554.71 Total site construction cost plus $560.00 annual operating cost
Revenue vs Electricity Cost
-$241.39 Deficit (Since Inception)
Metric | Amount |
---|---|
Energy Used | 252 kWh |
Revenue | $44.52 |
Electricity Cost | $285.91 |
Deficit | -$241.39 |
Electricity Usage
Site Information
Location
Address: N Hawbaker Cir, Clear Spring, MD 21722
County: Washington
Facility Type: Parking Lot
Coordinates: 39.657069, -77.930968
Directions: At SE corner of parking lot on N Hawbaker Cir.
Map Link: OpenStreetMap
Technical
Connector Type: J1772
Level 2: 7 kW x2
Uptime Avg. Jul-Dec 2023: 100%
Uptime Avg. Jan-Jun 2024: 100%
Detailed Uptime Data
Port | ’23 Q3 | ’23 Q4 | ’24 Q1 | ’24 Q2 |
---|---|---|---|---|
1 | 100% | 100% | 100% | 100% |
2 | 100% | 100% | 100% | 100% |
Avg. | 100% | 100% | 100% | 100% |
Access
Network: ChargePoint
Availability: Public
Hours: 24 hours daily
Price (subject to change): $0.21/kWh inclusive of 6% MD sales tax
Amenities
Restroom: Leonard P Snyder Memorial Library
Food: McDonald’s
WiFi: Leonard P Snyder Memorial Library
Signage
Signs: NO PARKING EXCEPT WHILE CHARGING
Marking: No special EV pavement marking
Enforceable: No, signage does not include the fine amount.
History
Open Date: 10-27-2022
Public Funding: $22,554.71 plus operating costs from PE ratepayers
Notes: Parking lot with charging station is accessed via N Hawbaker Cir. one block north of Cumberland St.
Map
View Larger Map
Discover more from Plug-In Sites
Subscribe to get the latest posts sent to your email.