Clear Spring, MD – Potomac Edison Charging Station

Clear Spring, Maryland Potomac Edison ChargePoint EV charging station

Potomac Edison owns and operates a Level 2 electric vehicle charging station in the town of Clear Spring, Maryland. The charging station is located in a public parking lot on N. Hawbaker Cir., one block north of National Pike/Cumberland Street. It’s about a 0.4 mile walk to the library and about 0.3 mile from McDonald’s. The two-port Level 2 charging station is part of Potomac Edison’s EV Driven program and uses the ChargePoint network.

Here are the details of this Featured PlugInSite.

Construction Cost

$22,554.71 Total site construction cost plus $560.00 annual operating cost

Revenue vs Electricity Cost

MetricAmount
Energy Used252 kWh
Revenue$44.52
Electricity Cost$285.91
Deficit-$241.39
Note: This calculation only reflects the difference between electricity costs and revenue as of June 30, 2024. Other operating expenses, such as maintenance and repair costs, are not included.

Electricity Usage

Clear Spring, MD - EV charging utilization Jan. 1 to Jun. 30, 2024
Clear Spring, MD – EV charging utilization Jan. 1 to Jun. 30, 2024

Site Information

Location
Address: N Hawbaker Cir, Clear Spring, MD 21722
County: Washington
Facility Type: Parking Lot
Coordinates: 39.657069, -77.930968
Directions: At SE corner of parking lot on N Hawbaker Cir.
Map Link: OpenStreetMap

Technical
Connector Type: J1772
Level 2: 7 kW x2
Uptime Avg. Jul-Dec 2023: 100%
Uptime Avg. Jan-Jun 2024: 100%

Detailed Uptime Data

Port’23 Q3’23 Q4’24 Q1’24 Q2
1100%100%100%100%
2100%100%100%100%
Avg.100%100%100%100%

Access
Network: ChargePoint
Availability: Public
Hours: 24 hours daily
Price (subject to change): $0.21/kWh inclusive of 6% MD sales tax

Amenities
Restroom: Leonard P Snyder Memorial Library
Food: McDonald’s
WiFi: Leonard P Snyder Memorial Library

Signage
Signs: NO PARKING EXCEPT WHILE CHARGING
Marking: No special EV pavement marking
Enforceable: No, signage does not include the fine amount.

History
Open Date: 10-27-2022
Public Funding: $22,554.71 plus operating costs from PE ratepayers
Notes: Parking lot with charging station is accessed via N Hawbaker Cir. one block north of Cumberland St.

Map


View Larger Map

Subscribe to PlugInSites via email

Stay in the Loop with PlugInSites! Subscribe with your email below:


Discover more from Plug-In Sites

Subscribe to get the latest posts sent to your email.

Leave a Reply