PlugInSite Recharge – Brughs Mill Country Store

Brughs Mill EA 2X
Three of Four Electrify America chargers at Brugh’s Mill Country Store reported inoperable as of July 8, 2022

Description:

Electrify America operates a fast charging station at Brugh’s Mill Country Store off I-81 Exit 156 near Fincastle, Virginia. This charging station is one of the first sites opened by Electrify America. It has four chargers in the parking lot of an independent gas station and quaint country store that is located in a rural section of the Shenandoah Valley about 15 miles north of Roanoke.

According to their Facebook page, Brugh’s Mill Country Store closes at 9:00 PM except Thursday, Friday and Saturday when they stay open till 10:00.

Status:
✅ 2 Unit Operable, ❌ 2 Units Inoperable as of August 16, 2022

July 8, 2022:
Three of the four Electrify America chargers at Brugh’s Mill Country Store are reported as “under repair” according to the Ford Pass app as of 8:30 AM, July 8, 2022. Recent reviews of this Electrify America station reflect frustration on the part of EV drivers.

A review posted on Google Maps by Natalia B from a week ago says the 350 kW charging doesn’t work. Reviewer Josiah B. posted six days ago, “Another half broken no amenity charging station.” He added that the adjoining business that has the restroom is not open 24/7.

Actions to Get This “Recharged”

re·charge 
1. to bring back to a former condition or vigor 
2. to bring back to life, practice, or activity

⏹ July 8, 2022:
Tweeted Electrify America to ask when EV drivers can expect that at least one 350 kW charger and the CHAdeMO unit will be back in service.

July 8, 2022, 8:45 AM:
Awaiting response from Electrify America.

July 9, 2022, 9:00 AM:
Still only one charger Available (100256-02) and three Under Repair (-01, -03, -04).
24 hours since alerting Electrify America to the issue and asking when EV drivers can expect to have the CHAdeMO and at least one 350 kW charger operable. No response so far.

July 10, 2022, 1:00 PM:
One charger Available (100256-02). Three Under Repair (-01, -03, -04).
More than 48 hours since alerting Electrify America and asking when EV drivers can expect to have the CHAdeMO and at least one 350 kW charger operable. No response as of this time.

July 15, 2022, 8:45 AM:
It’s been over one week since more than half the Electrify America chargers at the Brugh’s Mill Country Store location in Fincastle, VA have been “Under Repair.” Seven days of chargers being down out of 365 days in a year amounts to 98% uptime. Any longer and this particular charging site will fall below the 98% threshold.

July 23, 2022, 3:15 PM:
Two of the four chargers are now listed as “Available: two stalls are still showing as “Under Repair.” Three of the four stalls were reporting as under repair for at least two weeks since first being tracked here. More than half the dispensers at this site have been down 14 days or nearly 4% of a year. This means about 96% uptime at best on a yearly basis. 97% uptime is the expected requirement for uptime under the $5 Billion federally funded charging infrastructure program.

July 27, 2022, 3:15 PM:
Two of the four chargers at this location are still “Under Repair.” Electrify America responded today to the July 8 tweet in which we asked when EV drivers can expect a 350 kW charger and/or the CHAdeMO here to be back in service. Updated the graphic to reflect the current operational status.

Aug 2, 2022, 11:30 AM:
One charger Available (100256-02). Three Under Repair (01, 03, 04).
Two of the four chargers (01 and 02) were available for use for about a week, but now this site is back to having only one available. Electrify America had assured drivers vie their July 27 tweet that “our maintenance team is diligently working to restore the remaining chargers at this station as soon as possible.”

Aug 8, 2022, 11:10 AM:
One charger Available (100256-02). Three Under Repair (01, 03, 04).

August 11, 2022, 7:15 PM:
One charger Available (100256-02). Three Under Repair (01, 03, 04). Electrify America responded today to the August 8 tweet in which we alerted drivers that the Fincastle site is again down to only a single working charger. “Our maintenance team is conducting a thorough investigation into chargers 01, 03, and 04 at our Fincastle, VA location. We… hope to have these concerns resolved soon.”

August 16, 2022, 5:10 PM:
Two of the four chargers at this location are “Under Repair.” This site has mostly been with three chargers “Under Repair” since the July 8 tweet in which we asked when EV drivers can expect a 350 kW charger and/or the CHAdeMO here to be back in service. Updated the graphic to reflect the current operational status.

@Lanny