DriveOhio, a part of the Ohio Department of Transportation (ODOT), released an 85 page Electric Vehicle Charging Study to assess and coordinate a state-wide approach to developing EV charging infrastructure.

Fast Charging Every 50 Miles Along Ohio Highways

A key recommendation is to place EV charging stations at least every 50 miles along highway corridors throughout Ohio. Highway corridor charging would be high-powered DC Fast Chargers located within a mile of a highway.

The study identifies Fast Charging gaps along highway corridors and suggests options to fill them. Most of the charging stations are suggested to be installed at private site hosts such as larger gas stations and convenience stores. Some charging gaps could be filled by placing DC Fast Chargers at Ohio Turnpike Service Plazas or ODOT rest stops.

Level 2 charging needs that can support Ohio tourism are also identified. Destination charging stations are suggested at popular Ohio attrations such as the Pro Football Hall of Fame and Cedar Point Amusement Park. EV drivers can then recharge their vehicles using Level 2 stations while they are visiting these destinations.

75% of BEVs Registered in Ohio are Teslas

According to data in the report, about 75% of the all-electric vehicles registered in Ohio are Teslas. The Model 3 accounts for 27% of all plug-in vehicles (including plug-in hybrids) registered in the state.

The report calls for collaboration among the following state agencies to implement the proposed strategy: ODOT, the Ohio Turnpike and Infrastructure Commission, the Public Utilities Commission of Ohio, the Department of Administrative Services, the Ohio Environmental Protection Agency, the Ohio Department of Natural Resources, the Development Services Agency, and the Ohio Department of Public Safety.

Ohio has reason to support the expansion of EV charging infrastructure with Lordstown Motors taking over the former GM manufacturing facility to build electric pickup-trucks in the state.

The Electric Vehicle Charging Study is available on the drive.ohio.gov website.