Carroll County Commissioners BGE Charging Site – 2025 Report

Utilization, Uptime & Profit/Loss

Carroll County Commissioners Office Building in Westminster, Maryland is the site of the second public charging station owned and operated by BGE under a pilot program approved by the Maryland Public Service Commission. This location opened on December 10, 2019 and cost $93,382.53 to construct according to data from semi-annual progress reports submitted to the PSC. The BGE Carroll County Commissioners EV charging station consists of one 50 kW DC fast charger and one dual-port Level 2 unit. It is located in the parking lot of the Carroll County Government building that houses the offices of the Carroll County Commissioners. Downtown Westminster Main Street is a .3 mile walk south on Center Street. Restaurants including Jersey Mike’s, Blaze Pizza and Tropical Smoothie Cafe is about a 5 minute walk (0.2 miles) north on Center Street.

Note: This is the sixth in a series of reports of operational and financial performance data for Maryland utility-owned EV charging stations derived from various public data.

The data below reflects the activity for calendar year 2025 and includes data compiled from BGE’s Semi-Annual Progress Reports and Quarterly Reliability Reports. The Maryland Electric Vehicle Charging Reliability Act (HB 834) of 2023 requires 97% annual uptime for each utility-owned charging port.

Site Overview

  • Address: 225 Center, Westminster, MD
  • DCFC Ports: 2 (E1176, E1177)
  • Level 2 Ports: 2 (E1530, E1531)
  • Opened Date:        December 10, 2019
  • Installation Cost:     $93,382.53

Financial

Revenue for this site totaled $11,126.32 in calendar year 2025. The revenue comes from EV drivers who pay $0.32 per kWh for fast charging and $0.17 per kWh for Level 2. The blended cost/kWh for the year is $0.198. The rates that EV drivers pay are regulated by the PSC and has remained the same since 2019. The main operating expenses are the monthly electricity bills which totaled $8,451.62 in 2025. Preventive maintenance costs totaled $77.00 for the year. Corrective maintenance totaled $1,341.00. Maintenance and repair expenses are detailed in the utilities’ quarterly reliability reports. The yearly networking fee of $1,267 is based on $6,335 network costs for five years in the construction table in the semi-annual reports. Revenue and expenses for this site were essentially even with a slight operating loss of $10.30 for the year.

Utilization

  • 2025 Electricity Usage in kWh: 42,650
  • Monthly Electricity Usage in kWh (see table)
Carroll County Commissioners 2025 monthly utilization in kWh

Uptime

Uptime for all four port IDs at this site was reported as 100% every month. See table below.

DCFC Replacement

The original Efacec QC45 at this location was replaced with a BTCPower Model L35-50-480-01-001 in early 2023.

Notes and disclaimers: The presentation of this data is unofficial and best efforts are made to aggregate and portray them accurately. Consult the source reports for the official record. Some values are rounded to the nearest whole number. Where necessary, figures from Quarterly and Semi-Annual Reports have been combined for completeness.

Follow @PlugInSites on X and subscribe below for updates.


Discover more from Plug-In Sites

Subscribe to get the latest posts sent to your email.

Leave a Reply